Does your arc flash study need to be redone?

By Jay R. Prigmore II, Ph.D., P.E., voting member, IEEE 1584 working group · · 8 min read

The question almost always arrives in the same form: someone opens an arc flash study, finds “IEEE 1584-2002” in the methodology section, and wants to know whether the whole thing has to be thrown out. The short answer is that a superseded edition does not retroactively invalidate a study. The longer and more useful answer is that the 2018 edition changed what a defensible study has to write down — and most 2002-era studies are silent on exactly those points. That silence, not the edition number, is what the decision actually turns on.

What changed, briefly

The full technical account of the model changes — the test program behind the 2018 edition and how the model changed shape as a result — is written up at length on a separate site: IEEE 1584-2018 vs 2002: what actually changed(opens in a new tab, external site). This page is about the decision rather than the model, so what follows is only the part that bears on it. (powerengcalc.com is a separate property.)

Three consequences of the 2018 edition matter to anyone holding an older study:

  • Electrode configuration became an explicit input. How the conductors are arranged — their orientation, and whether the arc terminates in open air, inside a box, or against an insulating barrier — changes how energy is directed toward a worker. The 2018 model asks which arrangement applies. The 2002 model did not, so most studies built on it never recorded the answer, and the assumption is now unrecoverable from the document.
  • Enclosure geometry entered the calculation. The physical size of the box is treated as affecting the result rather than as incidental. A study that never recorded enclosure dimensions cannot be re-derived under the newer model without going back to the field.
  • The applicability envelope moved. Each edition states the range of voltages, conductor gaps, and fault currents its model is valid within, and those ranges are not the same. Equipment that sat comfortably inside the 2002 model's range may sit near or outside the 2018 model's, or the reverse. Read the ranges in your own copy of the standard and compare them against what your study actually modeled.

The 2018 edition also handles the variation in arcing current differently. Both editions recognise that the arcing current is not a single deterministic value and that a lower-than-expected arcing current can hold an upstream protective device in a slower part of its curve — producing a longer clearing time and therefore more incident energy, not less. This is the single most commonly skipped step in studies of every vintage, and it is the finding worth looking for first.

Why a 2002 study is not automatically wrong

Two things are often conflated: whether a study used a superseded model, and whether its results are unsafe. They are not the same question. A 2002-model study of a facility whose equipment sits squarely inside that model's range, whose protective devices have not been re-set, whose transformer has not been replaced, and whose assumptions are all written down is a document that can be examined and defended. A 2018-model study that never states its electrode configuration, run by someone who accepted every software default, is not made better by its edition.

What the newer edition really changed is the standard of documentation. It made explicit several things that used to be assumptions, and an assumption that has been made explicit is one a reviewer can check. That is why the edition question so often turns into a documentation question.

The four things the decision turns on

When this question comes up in practice, it resolves onto four points. None of them requires recalculating anything; all of them are answerable from the study document you already have.

  1. Does the study state its edition and model at all? If not, nothing else on this list can be evaluated, and that is the finding.
  2. Is the equipment inside the stated applicability limits? A result produced outside the range the model is valid within is a number, not an answer — and studies rarely flag when they have gone outside it.
  3. Was the reduced-arcing-current case run? If the study reports one incident energy value per bus with no second case and no narrative explaining its absence, the governing value may not be the one on the label.
  4. Does the study still describe the system you have? Editions are a red herring if a transformer was swapped, a tie was added, or a trip unit was re-set since the study was issued. A model that no longer matches the plant is wrong under any edition.

Where the periodic review fits

NFPA 70E requires the arc flash risk assessment to be reviewed periodically, and separately requires review when a change in the electrical distribution system could affect the results. Read the current edition for the interval and the precise triggering language — it is not reproduced here.

The practical point is that the second condition, not the calendar, is what usually makes a study stale. Facilities change continuously and quietly. The periodic review is simply the moment somebody finally has to look, which is why the edition question and the five-year question tend to arrive in the same email. If you are preparing for one, the edition is one of several things to check, and rarely the most urgent.

What to do with an old study

Start by reading it rather than replacing it. A full restudy is a five-figure exercise at most facilities, and it is the correct answer often enough that it should not be the reflexive one. The cheaper first step is to establish what the document you have actually establishes: which model, which inputs, which assumptions stated, which silent, and whether the plant still matches. That evidence is what makes the redo-or-not conversation a short one — with your Engineer of Record, who makes the call.

Check the study you already have.

Edition, model limits, electrode configuration, and the sensitivity case — each tied to a page.

Review an arc flash study →

FAQ

IEEE 1584 editions — common questions

Is an arc flash study done to IEEE 1584-2002 invalid?

No. An edition being superseded does not retroactively invalidate work performed under it, and the 2002 model was the state of the art for the better part of two decades. What changes is the evidentiary position: a study on the older model is more likely to be silent about inputs the newer model treats as decisive, which makes it harder to defend if anyone later asks why a particular value was used. Whether that silence matters at your facility is a determination for your Engineer of Record and your AHJ.

How do I tell which edition my study used?

A study that documents its methodology says so, usually in the methodology or assumptions section near the front, and often again in the software settings appendix at the back. If you cannot find an edition stated anywhere in the document, that is itself the finding — a study that does not record which model produced its numbers cannot be checked by anyone, including the engineer who inherits it from you.

Does new software mean my study is on the new edition?

Not by itself. Current versions of the major packages implement both models, and which one a given project used depends on the settings in that project file at the time the study was run. Re-opening an old project in a new version of the software does not re-run it. The study document, not the software version, is what records what was actually done.

How often does an arc flash risk assessment have to be reviewed?

NFPA 70E sets a maximum interval for reviewing the arc flash risk assessment and also requires review when a change in the electrical distribution system could affect its results. The second condition is the one that catches facilities, because it is event-driven rather than calendar-driven and nothing sends a reminder. Read the current edition for the interval and the exact triggering language — this page does not reproduce it.

Can you tell me whether I need a new study?

No, and no automated product should claim to. What the arc flash study review on this site does is read the study you already have and report what it does and does not establish — which edition and model it states, whether the equipment falls inside the applicability limits of that model, whether electrode configuration and gap are documented, and whether the reduced-arcing-current case appears anywhere. That is the evidence the decision needs. The decision itself is the Engineer of Record’s.